Search This Site

Navigation
Home

Downloads
ePanel Builder

Flying Images
Get an N-Number!
Ground Images
Paint Scheme
StabCam
Timeline / Progress
Tips, Tricks, & Ideas

Vendor Links
N8WV Videos
Yucksters Email List
Contact Me
Report broken links
vondane
 
Trip pix & movies
Longmont '02
Reno '02
Copper '03
Las Cruces '03

Leadville '04
Creede '04

Leadville '06
Formation
Other
 
Empennage
The Kit
Vertical Stabilizer
Horizontal Stabilizer
Elevators
Rudder
 
Wings
The Kit
Ailerons
Flaps
Wings Page 1
Page 2 - Page 3

Page 4 - Page 5
 
Fuel Tanks
Fuel Tanks Page 1
Page 2 -Page 3
 
Fuselage
The Kit
Fuselage page 1
page 2 - page 3
page 4 - page 5
page 6 - page 7
page 8 - page 9
page 10 - page 11
page 12 - page 13
 
Finish Kit
Finish Kit / Page 1
page 2 - page 3
page 4 - page 5
page 6 - page 7
page 8 - page 9

page 10 - page 11
Page 12
 
Canopy
Canopy Page 1
page 2
 
Panel & Electrical
Instrument Panel
Inst Panel Upgrade 1
Inst Panel Upgrade 2
PU2 Page 2
Wiring page 1
page 2 - page 3
page 4 - page 5

Diagram - HTML
Diagram - PDF

Diagram - Visio
Visio Symbols
 
Interior
Seats
 
Firewall Forward
Engine & Prop
Engine Page 1
Page 2 - Page 3

Page 4
Baffles page 1
Page 2

Cowling page 1
Page 2

Overhaul Page 1
Page 2
Catto Prop
 
Upgrades
Page 1

Web Resources:
ePanel Builder

Dan's RV Finder
Van's Aircraft
RV-8A Details
RV Builders E-List
RV-8 Builders E-List
Van's Air Force WWW
Builders Yeller Pages
EAA National
EAA Chapter 72

EAA Chapter 808

 

RV-8A Websites:
Jim Andrews
Mark Andrews
Jerry Carter

Ray Fogg
Craig Hatch

 

RV-8 Websites:
Larry Bowen
Bill Bruton
Francis Butler
Jim Cimino
Mickey Coggins
Moe Colontonio
Jim Daniels
Rod Dantzler
Brian Denk
Randy Griffin
Greg Hale
Bob Hargrave
Chris Hinch
Kevin Horton
Dave Hrycauk
John Huft
David Hunt
Jeff Jasinsky
Ed Kowalski
Randy Lervold
Jeff Ludwig
Ben Medina
Charles Newman
Mark Richardson
Mike Robbins
Louis Smith
Ed Storo

Brad Vier
Duncan & Whitehead

 

Other GREAT RV Builder's Sites!
Paul Besing's RV-6
Sam Buchanan's RV-6
Randy Lervold's RV-3
Bruce Meacham's RV-3
Mike Nellis' RV-6
Doug Reeves' RV-6
Paul Stratman's RV-6A
Mark Tingle's RV-6
Gary Zilik's RV-6A
Van's RV Builders List

 

First in Flight

August 14, 1901


My status

 

 

 

Horizontal Stabilizer

Started 9.26.1999 - Finished 11.3.1999


air.jpg (61702 bytes) Here is my air plumbing system.  I put the compressor in the basement, and use sched. 20 PVC to plumb the garage...

emp9.jpg (30462 bytes) emp8.jpg (62516 bytes) emp7.jpg (75272 bytes)

I had a problem with the far right HS-413PP mount bracket (see pictures above) and had to wait to get a new one to continue, so I built the vertical stab in the interim...
9.26.99 - Started on the HS.  deburred edges of HS skins and HS rear spar webs.  Clecoed rear spar webs to skins and match drilled to size.  Removed skins.  Deburred and dimpled  holes in HS rear spar webs.
9.28.99 - Finished clecoing the rear HS spar together and match drilling all holes.   Marked parts positions and disassembled rear spar.  Started fabricating the HS-810 HS-814 splice angles...
9.29.99 - Continued fabricating the HS-810 HS-814 splice angles...
9.30.99 - Continued on the HS-810 HS-814 splice angles.  Trimmed the HS-602 spar web inboard ends to accommodate the splice angles.  Match drilled front spar webs to splice angles (inboard portion), bent splice angles and web tongues to 6 degrees, and then finished match drilling spar webs to splice angles.   Deburred splice angles & spar web.
10.1.99 - Finished drilling, dimpling, and countersinking for riveting front spar together.  Started priming rear HS spar parts.  I am using Sherwin Williams 988 self-etching primer...
emp5.jpg (68780 bytes) 10.2.99 - Deburred & fluted HS ribs and Finished priming HS parts.  I used an aluminum rule that I have along with a Bic marking pen to mark center lines on all of the ribs, and spar webs (pictures below)...  Riveted front and rear HS spars together.  Matched drilled the 5 ribs between the front and rear spars to the rear spar, and then deburred.   Mounted HS skeleton to the jig.
emp6.jpg (67739 bytes)

emp1.jpg (70521 bytes) emp2.jpg (64360 bytes) emp3.jpg (77085 bytes)

10.17.99 - Got my new HS413PP bracket installed, mounted HS back in the jig, finished match drilling ribs to front and rear spars. Deburred ribs and riveted ribs to rear spar.  Lined up and straightened the HS in preparation for drilling the skins...
hs10.jpg (64904 bytes) 10.18.99 - Clecoed skins to skeleton and drilled...  Next step is to finish riveting skeleton together, debur, dimple, and rivet skins on...
hs11.jpg (73161 bytes) Top of HS is riveted.  You are looking at the bottom...
hs12.jpg (70883 bytes)  

10.28.99 - Riveted the bottom left skin on the HS.  I had to put a pop rivet in the leading edge rib position...

hs13.jpg (49012 bytes)
hs14.jpg (76874 bytes) 11.3.99 - Finished riveting the skins on the HS.  Installed the inboard leading edge ribs and riveted...
hs15.jpg (76367 bytes) Finished Product!

Home  |  Back  |  Elevators